Sn. | Sub Project | Project Goal |
---|---|---|
1. | Deepening and Strengthening Berths 1-7 and RoRo Terminal. | Larger vessels, higher berth load bearing, more effective operations, additional space. |
2. | Dredging Entrance Channel, Harbour Basin,Turning Circle. | Post panamax vessels with deepest draft to be able to enter in the port. |
3. | Deepening and Strengthening Berths 8-11. | Larger vessels, higher berth load bearing, more effective operations, additional space. |
4. | Improvement Rail Linkages and Rail Terminals. | Optimised linkage of TRC and standard gauge and TAZARA railway to DSM Port. |