Welcome To Dar es Salaam Maritime Gateway Program (DMGP) Welcome To Dar es Salaam Maritime Gateway Program (DMGP) Welcome To Dar es Salaam Maritime Gateway Program (DMGP) DMGP
  • dg@ports.go.tz
  • 0800-1100 32
  • P.O.Box 9184 Dar es Salaam,Tanzania
  • Home
  • About Us
    • About DMGP
    • The Team
  • News & Updates
  • Projects
  • GRM
  • Financiers
  • Gallery
  • Documents
  • Contact Us
Send Your Query

Uncategorised

  • Home
  • Projects
  • Uncategorised

Institutional Strengthening and Implementation Assistance

Sn. Sub project Project Goal
1. Update National Port Masterplan Improved cargo handling and transport of cargo within and between all TPA ports.
2. Supervision Berth 1-7 & RoRo Ensure compliance of design and execution of 1.1.1 as per contract agreement.
3. ESIA Study Dredging Prepare binding HSE guidelines for design and execution of dredging works 1.1.2.
4. Supervision Dredging Ensure compliance of design and execution of 1.1.2 as per contract agreement.
5. Supervision Berth 8-11 Ensure compliance of design and execution of 1.1.3 as per contract agreement.
6. Supervision Rail Terminals Ensure compliance of design and execution of 1.1.4 as per contract agreement.
7. Technical Assist. to Implement.  Technical assistance port engineering and port project management.
8. Procurement Assistant Transfer of expertise to uplift TPA staff to work according International Standards.
9. Capacity building / training  Increase of expertise of all TPA staff with regard to port upgrade as per DMGP.
10. Institutional strengthening TPA Sound organisation structure, procedures and resources ensuring TPA economic success.
11. Independent technical auditor Ensure compliance of performance of projects monitoring of DMGP success.

Improving the Physical Infrastructure

Sn. Sub Project Project Goal
1. Deepening and Strengthening Berths 1-7 and  RoRo Terminal. Larger vessels, higher berth load bearing, more effective operations, additional space.
2. Dredging Entrance Channel, Harbour Basin,Turning Circle. Post panamax vessels with deepest draft to be able to enter in the port.
3. Deepening and Strengthening Berths 8-11. Larger vessels, higher berth load bearing, more effective operations, additional space.
4. Improvement Rail Linkages and Rail Terminals. Optimised linkage of TRC  and standard gauge and TAZARA railway to DSM Port.

 

Latests

Here are the Latest projects from TPA being supervised by DMGP. Images will also be provided here

Gallery

  • Click to enlarge image DAR_PORTS_RoRo_BERTH 1.jpeg
  • Click to enlarge image Training-of-TPA-staff.png
  • Click to enlarge image World-Bank-Transport-Mission.png
  • Click to enlarge image comerstoneEvent.png
  • Click to enlarge image eventCHEC.png
  • Click to enlarge image improving.jpeg
  • Click to enlarge image institutional.jpeg
  • Click to enlarge image suggestionbox2.jpeg
  •  
  • Click to enlarge image World-Bank-Transport-Mission.png
  • Click to enlarge image serminar_01.jpg
  • Click to enlarge image serminar_02.jpg
  • Click to enlarge image slider_01.jpg
  • Click to enlarge image slider_02.jpg
  • Click to enlarge image slider_03.jpg
  • Click to enlarge image tpa_web_sider.jpg
  •  

More Articles …

  1. Financiers
  2. The Team
  3. A Grievance Redressal Mechanism
  4. Projects
Page 1 of 2
  • Start
  • Prev
  • 1
  • 2
  • Next
  • End

Lates Articles

Cornerstone Event CHEC Contract

Cornerstone Event CH...

Cornerstone Event CHEC Contract

Cornerstone Event CH...

 A Grievance Redressal Mechanism

A Grievance Redress...

Quicks Links

  • Projects
  • GRM
  • The Team
  • FAQ

Related Links

  • TPA
  • World Bank
  • TMEA
  • DFID

Contact Information

  • P.O.Box 9184 Dar es Salaam, Tanzania
  • Phone: 0800-1100 32
  • Fax: +255 22 2130390
  • Email: dg@ports.go.tz

Copyright © 2023 Dar es Salaam Maritime Gateway Program (DMGP). 

  • FAQ
  • SITEMAP
  • GRM
  • PRIVACY POLICY