Improving the Physical Infrastructure

Improving the Physical Infrastructure

Sn. Sub Project Project Goal
1. Deepening and Strengthening Berths 1-7 and  RoRo Terminal. Larger vessels, higher berth load bearing, more effective operations, additional space.
2. Dredging Entrance Channel, Harbour Basin,Turning Circle. Post panamax vessels with deepest draft to be able to enter in the port.
3. Deepening and Strengthening Berths 8-11. Larger vessels, higher berth load bearing, more effective operations, additional space.
4. Improvement Rail Linkages and Rail Terminals. Optimised linkage of TRC  and standard gauge and TAZARA railway to DSM Port.

Date

15 December 2023